Back to search result
Breidalsoverføringen
Sustainability and green
Driving of a 15 km tunnel in rock with inlet and outlet constructions.
Blasting and construction work in connection to the building of a pumping station with a volume of 9400 cum with and a cross section of 188 sqm.